Concrete Contractor in Dublin, CA - Driveways and Patios Planned Before We Pour

P&J Castro Valley Concrete Company pours driveways, patios, pool decks, steps and retaining walls for homeowners in Dublin, CA. I come out to do the estimate myself, and our own crew digs out, packs the base, pours and finishes.

Curved concrete pool deck with a blue speckled finish surrounds a screened swimming pool.

Dublin: original slabs and builder-graded yards

On Dublin jobs we mostly meet two kinds of property. One is the established neighborhoods in the flatter middle of the city, where the driveway, walk and patio are often the originals and have started to crack, sink or hold water. The other is the newer homes out east and up toward Dougherty Hills, where a builder graded the yard and the owner now wants a patio, a pool deck or more room to park. It's the same mix we see next door in San Ramon.

Each one changes the job before we talk about finish. An old slab means tear-out and a hard look at the subgrade, the dirt the slab sits on, while a sloped or builder-graded yard means working out where the water runs and whether the ground needs a wall to hold it.

  • Licensed and insured.
  • Free on-site estimates.
  • We respond within 1 business day.
Get your free quote

Concrete work we do in Dublin

  • Concrete driveway building

    Older Dublin driveways often crack or sink near the garage. We break out the old slab and pack a new base before the pour.

  • Concrete patio construction

    Newer backyards here often come as bare builder grading. We slope the patio away from the house so rain runs into the yard, not under the door.

  • Concrete pool decks

    Pool owners in Dublin want a deck that drains and isn't slick underfoot. Our concrete pool decks get a textured finish and slope toward the drains.

  • Concrete retaining walls

    Hillside yards often need a wall before a flat patio fits. We pour a proper footing first so the wall holds the ground behind it.

  • Concrete steps construction

    Sloped lots put steps between the driveway, front door and yard. We form every rise the same height so no step catches a foot.

  • Stamped concrete services

    Newer Dublin homes often want a patio or walk that matches the house, not plain gray. We stamp and color it after the base and drainage are right.

Working in Dublin: permits, licenses and the plan

  1. Permits in Dublin come from the city's Building and Safety Division, which issues them for most construction and repair work. Whether your job needs one is the city's call, so I check with the division early, and when it does we handle the application and set up the inspections. Whether a permit goes through plan review or gets issued at the counter changes when we can start, so we know which one we're dealing with before we set a date. The city also requires anyone doing business inside its limits to hold a current Dublin business license, including subcontractors and companies based in other cities, so it's a fair thing to ask any contractor you're comparing.

  2. Our crew comes over the hill from Castro Valley on 580, so Dublin is a normal drive for us, and we do the same work in Pleasanton and San Ramon. What moves the price is mostly the work you won't see once it's done, like tear-out, digging, base and how the yard slopes. The schedule turns on the permit, if there is one, and on curing, the wait while the new concrete gains strength before you walk or drive on it. When I walk the job with you, the estimate says what's included, so you know what the number covers.

Get a free on-site estimate for your Dublin concrete job

Send the form or call (510) 264-7164, tell us what you're planning in Dublin, and ask about permit steps while you're at it. We reply within one business day, and then I come out, walk the job with you and give you an estimate that says what's included. There's no obligation and no pressure to book.

  • Licensed and insured.
  • Free on-site estimates.
  • We respond within 1 business day.
(510) 264-7164

Concrete questions from Dublin homeowners

Does my concrete patio or driveway project need a permit in Dublin?

Plan on a permit for a new patio, because patios are on the city's list of work that needs one, along with retaining walls, pools and additions. The city's building permits page doesn't name driveways, and its list is open ended, so we ask the division about your driveway before the schedule is set.

How long does plan review take for a building permit in Dublin?

A permit that needs plan review takes about two to three weeks to process, which is 10 to 15 business days, while most minor permits are issued over the counter. If the job also needs DSRSD review, that goes to DSRSD separately and has to be approved before the city issues the building permit. We find out which path your job is on at the start, so the pour date is set around it.

Do I need a permit for a short retaining wall in Dublin?

The city exempts retaining walls up to three feet tall, unless the wall holds back an added load or a ground slope of five percent. Taller walls, and short ones holding back a load or a slope like that, need a permit, so I look at the grade behind the wall when I come out.

Do I need a permit for a shed on a concrete slab in Dublin?

The city's exempt list says a one-story detached shed needs no building permit if it stays within 120 square feet and under eight feet tall with no electrical or plumbing, but you still need zoning clearance before you build. Wiring or plumbing in an exempt shed still needs its own permit, and since the list doesn't speak to the slab under it, we check that with the division too.

How much does a new concrete driveway cost in Dublin?

The price comes down to the size, how much old concrete comes out, how much base the ground needs, the slope, how close the truck can get and the finish you pick. Rebuilding the base under a sunken slab costs more than pouring on ground that's ready, and a stamped or colored finish costs more than a broom finish, the light texture that gives tires and shoes grip. I'll give you your number on site, written out with what's included.

What is the best way to keep a new driveway from cracking like the old one?

Start with a base that's dug out and packed hard, then cut control joints on time, the grooves that give the slab a straight place to crack instead of a random one. Old driveways that sink usually had dirt raked level instead of dug out and compacted, so the slab settled with it. If the budget's tight, I'd save on the finish, not the base, because you can change a surface later but not what the slab sits on.